Had a guy on Fiverr render our kitchen layout. I don’t even want to say “proposed” because this is just what is currently in the designer plans. Nothing looked at by cabinet makers or decisions around fixtures, faucet, everything. Gave the guy the floorplan and said “let’s see this in 3D.” We provided some feedback like SW Smoky Blue cabinets, Walls SW maybe, medium wood hardwood floor, maybe this color countertop. But nothing actually selected. We really just wanted to visualize the spaces.
We’ll probably do a whole different color scheme for pantry and mudroom, I just didn’t bother getting that granular with Fiverr dude. I did decide that since my wife wants blue cabinets that doing panel ready stuff would just be too much damn blue. The stainless + blue cabinets + brushed nickel pulls I think will balance well. I like the silver and blue contrast. Save us some money and may let us do a full size fridge instead of cabinet depth. Hard to find full size, fridge only, panel ready that I liked.
View attachment 618444
For exterior I’m really starting to lean heavier into Craftsman or some type of Clean Craftsman. This is more of my Gemini work and not our designer drawings. I can’t quite get it to do the base / plinth and windows like I want. The base and water table should only come up to our interior floor level and not the sill and the 1st floor windows I would like to be 6’ or 7’, we need to have our window meeting. With 10’ floors we should not have a problem. None of those front facing windows are bedrooms so we aren’t constrained by egress or sill height. 24” water table, 30” sill height? Allow for full exterior casing or whatever of windows. And then second story will be 5’, those are bedrooms. And for some reaon AI put bricks around those windows. I had to stop foghting
I like the wood texture gable instead of doing shakes which would be more traditional. Also may want to swap out columns for square tapered (more traditional craftsman). I still can’t get behind fake trusses in the gables. Exposed beams or knees would also be fake. I guess that’s why I’m calling it “clean craftsman.”
View attachment 618449
Hoping to get final plans back this week. He had to redraw them with 2x6 framing instead of 2x4 and tweak the entry to be more balanced. Also modify the front door. Then maybe we can get builder quote and are targeting end of March to get to the bank and discuss construction loan options.